Wafr builds sustainable infrastructure engineered for the AI era with less power, less water and within less time

Wafr designs and manufactures the electrical, mechanical and thermal systems that make it possible, from transformers and switchgear to cooling and thermal storage, with shorter lead times and lower resource demand.

Electrical
Mechanical
Thermal
LESS POWER, LESS WATER, LESS TIME
The Wafr model

Modern infrastructure is running into two physical constraints: speed and resource use.

Wafr solves both

One Wafr equipment platform addresses both constraints. Power delivery, heat rejection and thermal storage are coordinated as a single deployment.

Get the facility online faster

Wafr power equipment (transformers, switchgear and modular substations) is engineered as one coordinated package that removes equipment-driven delay.

Operate with less power + water

Wafr thermal solutions, paired with dry and adiabatic heat rejection, shifts and reduces cooling demand while limiting dependence on water.

EQUIPMENT PREVIEW

Equipment your project depends on.

Scroll through Electrical, Mechanical, and Thermal equipment to preview each system.

01
ELECTRICAL

Power distribution

Transformers and switchgear for utility, industrial and data centre infrastructure.

Transformers

Project-specific power transformation

Switchgear

Protection, control and distribution

02
MECHANICAL

Heat rejection

Dry and adiabatic systems engineered for site-specific ambient conditions and cooling loads

Dry Coolers

Closed-loop heat rejection

Adiabatic Dry Coolers

Hybrid heat rejection for high ambient temperatures and peak cooling loads

03
THERMAL

On-Demand Cooling

Purpose-built thermal solutions for high-density computing, thermal load management, and resilient data-centre cooling.

Thermal Storage Battery

Thermal load shifting and resilience

FRDGE

Thermal infrastructure for high-density compute

ELECTRICAL / POWER DISTRIBUTION
MECHANICAL / HEAT REJECTION
THERMAL / FRDGE

Electrical

Transformers + Switchgear

Explore →

Mechanical

Dry + Adiabatic Cooling

Explore →

Thermal

FRDGE + Thermal Storage

Explore →
CRITICAL
Serving critical infrastructure

One coordinated portfolio, covering Electrical, Mechanical and Thermal Equipment

Wafr provides electrical, mechanical and thermal equipment as individual products or as one coordinated package, helping projects align critical systems, simplify procurement and move from design to deployment faster.

Equipment preview

Electrical / Power Delivery

Transformers

Pad · Pole · Dry · Oil · Wound Core

Transformers

25-8,500 kVA

Up to 40.5 kV classes

Multiple formats for distribution and project-specific power delivery.

Explore →
Switchgear

Indoor VCB · Withdrawable Metal Clad

Switchgear

7.62-40.5 kV

VCB current up to 4,000 A

Protection, control and distribution across medium-voltage systems.

Explore →
Modular Substations

Outdoor Kiosk · Factory Integrated

Modular Substations

10 kV kiosk

HV + transformer + LV package

Factory-built substation blocks for rapid outdoor deployment.

Explore →

Thermal / Energy + Cooling

Dry Coolers / Adiabatic Dry Coolers

V / Flat · Spray · Adiabatic Options

Dry Coolers / Adiabatic Dry Coolers

120-5,100 m²

200-1,800 mm fan diameter

Water, ethylene glycol and propylene glycol heat-rejection packages.

Explore →
Thermal Storage Batteries

WTB Series. Thermal Storage

Thermal Storage Batteries

500-2,000 kWh(th)

Thermal load shifting for cooling systems

Positive-temperature storage for chilled-water and industrial cooling loops.

Explore →
PCS + Boosting Cabinets

Advanced cooling system

FRDGE

1 MW-Multi MW

Integrated cooling + thermal storage

Uses ambient conditions and stored cooling to reduce mechanical cooling, peak demand and resource use.

Explore →
FROM GRID CONNECTION TO REJECTED HEAT
A coordinated Wafr equipment platform built to compress delivery schedule and simplify project execution.
Why Wafr moves faster
01
Repeatable equipment platforms
Defined product families reduce unnecessary redesign and help move projects into production faster.
02
One procurement owner
Power, cooling and storage under one Wafr order.
03
Factory-tested modules
Integration and Factory Acceptance Testing (FAT) prior to site delivery.
04
Pre-delivery testing
Applicable testing and acceptance checks are completed before equipment reaches site.
How Wafr supports projects

From specification to delivery.

Wafr works with project teams to turn technical requirements into configured equipment, complete the supporting technical package, and move approved equipment into production and delivery.

01
Define the requirement

Confirm ratings, site conditions, applicable standards, schedule and project constraints.

02
Configure the equipment

Match the right equipment platform, ratings and options to the project.

03
Approve the technical package

Coordinate drawings, datasheets, submittals and required documentation for project review.

04
Move to production

Release approved equipment, track production and coordinate delivery against the project schedule.

Industries

Critical environments Wafr supports.

Quality
COMPLIANCE
DOCUMENTATION

Equipment that meets your project requirements.

Wafr equipment based on the certification, standards and documentation requirements of each project, including equipment available with applicable CSA, UL/cUL, IEEE/ANSI, NEMA and ISO requirements.

Available with applicable equipment.

CSA

UL / cUL

IEEE / ANSI

NEMA

ISO / QA

01 / REQUIREMENTS

Built to your specification.

We provide equipment based upon the electrical, mechanical, certification and documentation requirements of your project.

02 / COMPLIANCE

The standards your project requires.

Equipment can be supplied with applicable Canadian and U.S. certifications, listings and standards based on project requirements.

03 / DOCUMENTATION

Ready for technical review.

Available documentation can include drawings, specifications, manuals, test reports and applicable certification records to support engineering review and project approval.

Let's connect

Talk to our team

Start with a simple general inquiry to begin the conversation, or tell WAFR what equipment you need, where it’s going, and when the project needs it.