Industries

Data Centres

High-density compute infrastructure

Infrastructure for high-density compute.

Electrical, mechanical and thermal equipment for data centre projects where power density, cooling capacity and schedule all matter.

Industry equipment

What matters

The compute is only useful when the infrastructure around it is ready.

Data centre delivery depends on electrical capacity, heat rejection and the availability of long-lead equipment. Wafr supports project teams with selected equipment packages, technical documentation and project-specific configuration.

01

Power capacity

Transformers and switchgear aligned to facility electrical requirements and project architecture.

02

Thermal capacity

Dry, adiabatic and Wafr thermal equipment selected around load and site conditions.

03

Schedule & documentation

Equipment documentation and delivery planning organized around project milestones.

Relevant equipment

Equipment for the application.

Start with the product family, then move into technical specifications, documentation and a project-specific RFQ.

Applications

Where the equipment gets used.

AI / HPC facilities, Colocation, Enterprise data centres, High-density retrofits, Liquid-cooled deployments, Campus expansions

Start with the project basis

What to send Wafr.

A useful RFQ starts with the project conditions that actually determine equipment selection and delivery.

01

Facility load

IT load, operating load and planned expansion.

02

Electrical basis

Incoming voltage, one-line and distribution requirements.

03

Thermal basis

Cooling duty, supply / return temperatures and design conditions.

04

Schedule

Site location, target delivery and commissioning milestones.

Have a one-line, equipment schedule or design basis?

Send it with the RFQ and Wafr can start from the project requirements.

Start Project RFQ